Beauty Decorative Concrete Overlay.
Allow the floor to dry for 4 to 6 hours, or until there is no sign of moisture. Wait for the clear acrylic coating to dry for 2 to 3 hours before applying a second layer if desired. Normal traffic can be resumed approximately 8 hours after applying the last layer.